Follett Horizon Chewblet 1010 Series Manuale di istruzioni per l'installazione - Pagina 12
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Fabbricatore di ghiaccio Follett Horizon Chewblet 1010 Series. Follett Horizon Chewblet 1010 Series 17. Models with ride technology
Connect louvered docking assembly to ice machine.
• Plug must be accessible after final installation.
• H_E1410A/W 230/50/1) requires a 20 amp circuit (4.00 mm
Air-cooled ice machines – follow steps 7.1 through 7.5.
7.1
Ice transport tube
➋
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
• For H_E units, install a suitable plug
12
CAUTION
2
➊
➊
➋
Internal connections
wire)
7.2
Potable water and drain lines
• Insert potable water line into valve
7.4
Power cord
• Position plate into opening and secure
with supplied screw
self-contained
➊
VISION • RIDE Technology
7
➊