Follett Horizon Elite 1412 Manuale di istruzioni per l'installazione - Pagina 7
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Fabbricatore di ghiaccio Follett Horizon Elite 1412. Follett Horizon Elite 1412 12.
2.4
Phase monitor adjustments (if necessary)
The phase monitor is preset to 208 Vac from the factory.
1.
If building voltage is less than 208 Vac, consult technical service.
2.
See below chart for phase monitor diagnostics.
3.
PLEASE NOTE THAT ANY TIME POWER IS APPLIED TO THE CONDENSING UNIT, OR THE
UNIT COMES OUT OF A FAULT STATE, IT WILL TAKE APPROXIMATELY 200 SECONDS FOR
THE UNIT TO POWER ON.
INDICATOR LIGHT
GREEN
GREEN
RED
RED
RED
RED
REMOTE CONDENSING UNIT
STATUS
RUN
RESTART DELAY
REVERSE PHASE
UNBALANCE / SINGLE PHASE
(SEE EXAMPLE BELOW)
LOW VOLTAGE
HIGH VOLTAGE (201A-9 ONLY)
7