Follett Horizon Elite Chewblet HCD1010NVS Manuale di istruzioni per l'installazione - Pagina 5

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Fabbricatore di ghiaccio Follett Horizon Elite Chewblet HCD1010NVS. Follett Horizon Elite Chewblet HCD1010NVS 17. Ice machine with ride technology
Anche per Follett Horizon Elite Chewblet HCD1010NVS: Manuale (8 pagine), Manuale (8 pagine)

Follett Horizon Elite Chewblet HCD1010NVS Manuale di istruzioni per l'installazione

Prepare the installation site.

Provide drainage, water supply and electrical power to within 6 feet (2 m) of
ice machine in accordance with local and national codes. Outdoor installation
of low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
2 ft. x 1" OD
silicone tubing
Electrical
• 120/60/1–5 amps
Potable water supply
• 10–70 psi (69–483 kpa)
• 45–90 F (7–32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drain
(3/4" BARB)
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4 mm/0,3 m).
Refrigeration lines
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
VISION • RIDE Technology
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" PVC Drain
(3/8" push-in internal connection, 3/8" OD tubing required)
remote condensing

Site preparation

1/4" per foot
(6,4 mm per 0,3 m)
2
NEMA
5-15
3/8" ∅ (9,5 mm)
5/8" ∅ (15,8 mm)
1'
5