Follett Horizon Elite HCD1810NBS Manuale di istruzioni per l'installazione - Pagina 5

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Fabbricatore di ghiaccio Follett Horizon Elite HCD1810NBS. Follett Horizon Elite HCD1810NBS 16. Ice storage bins ice machine with ride technology
Anche per Follett Horizon Elite HCD1810NBS: Manuale di avvio rapido (8 pagine), Manuale (8 pagine)

Follett Horizon Elite HCD1810NBS Manuale di istruzioni per l'installazione
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of
ice machine in accordance with local and national codes. Outdoor installation
of low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1-5 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drains:
3/4" Barb for silicone drain, 3/8" push-to-connect for chassis drain
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4mm/0,3m).
Refrigeration lines
• 7/8" ∅ (22,4 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
BIN • RIDE Technology
(3/8" push-in connection, 3/8" OD tubing required)
self-contained
7/8" ∅ (22,4mm)
3/8" ∅ (9,5mm)
1/4" per foot
(6,4 mm per 0,3 m)

Site preparation

3/8"
chassis
drain must be
used
2 ft. x 1" OD
silicone tubing
and ttings
provided
NEMA
5-15
2
5