DQE Decono HM2000C Istruzioni per il montaggio
Sfoglia online o scarica il pdf Istruzioni per il montaggio per Apparecchiature per il bagno DQE Decono HM2000C. DQE Decono HM2000C 2.
SAVE THESE INSTRUCTIONS FOR IMPORTANT OPERATING, PARTS, AND MAINTENANCE INFORMATION
Decono® Shower
1
HM2000C
4
3
2
5 6
1
Assembly Instructions
A. Remove, inspect, and count all parts (see Parts List below).
B. Assemble base by connecting the two Shower Support Legs (#1) to the
Upright Valve Coupling (#2).
C. Insert Vertical Upright (#3) into Upright Valve Coupling (#2).
D. Insert Shower Head Attachment (#4) in Vertical Upright (#3) as shown.
E. Attach water hose (garden hose fitting) to Brass Hose Shutoff (#5)
at base of shower.
F.
If water supply is greater than 90 psi pressure, use the Pressure Reducing
Valve (#6) between the water supply hose and the Brass Shutoff Valve (#5).
Parts List
Replacement parts are available. Contact DQE to order.
PART NAME
1. Shower Support Legs
2. Upright Valve Coupling
3. Vertical Upright
4. Shower Head Attachment
5. Brass Hose Shutoff
6. Water Pressure Regulator
7. Carry Bag (not shown)
8. Sandbags (not shown)
www.dqeready.com | p. 800-355-4628 | f. 317-295-9822 | [email protected]
PART CODE
For shower warranty
QTY
PART NUMBER
2
HMPT2000C1
1
HMPT2000C2
1
HMPT2000C3
1
HMPT2000C4
1
N115C
1
HM212
1
BAGD
2
HM1075