Draper Acumen E Istruzioni per l'installazione e il funzionamento - Pagina 3
Sfoglia online o scarica il pdf Istruzioni per l'installazione e il funzionamento per Schermo di proiezione Draper Acumen E. Draper Acumen E 12. Electric projection screen 220v
Anche per Draper Acumen E: Istruzioni Installazione e funzionamento (12 pagine)
Acumen
E & V - 220V
™
Section 2 - Fascia Removal
MUST BE DONE PRIOR TO REMOVAL OF SHIPPING BRACKETS
To remove fascia:
1. Remove the screws from bottom from lip at each end of the fascia using 3/32" hex wrench.
2. Lift fascia off of the top lip of the case spine extrusion.
To install fascia:
1. Hook the top lip of fascia over the top lip of spine extrusion.
2. Push bottom edge of fascia towards the case spine.
3. Align holes in fascia with end cap holes and screw in
the attachment screw using 3/32" hex wrench.
Section 3 - Removing Shipping Brackets
Screen should not be operated until after
dowel shipping brackets are removed
Please Note: Before fully operating screen: lower viewing surface enough to fully
expose shipping brackets, then remove shipping brackets See Fig. 2.
SCREEN
DOWEL
2
Remove ½"
carriage bolts
brackets to the roller brackets.
Section 4 - Operation
220V Single Station Control — 3-position up-off-down switch permits operation to be stopped at any point.
Factory adjusted limit switches automatically stop screen when fully down or fully up.
For LVC-IV Controls:
24V Control — Three-button up-stop-down switch
when fully down or fully up.
1. Key-operated power supply switch controls power to unit and switches. When "off", switches will not operate. Key may be removed in either "on" or "off" position.
2. A three-position key switch permits screen to be operated directly by key. In this case, screen operator must always have a key.
RS232 / Ethernet — Serial communication and network communication available.
(Tab-Tensioned Screens Only)
BACK VIEW
hex bolts
and
(13mm)
securing
"green"
stop at any point desired, operate in any sequence. Factory adjusted limit switches automatically stop screen
(es)
1
1
2
Figure 1-B
Figure 2
1
Remove ½"
securing
"green"
to the
"gold"
attached to dowel.
SCREEN
DOWEL
3
Lower screen surface down some
and remove the
"gold"
brackets
from the dowel.
Retighten the
dowel screws.
page 3 of 12
2
Figure 1-A
3
R o lle r
S C R E E N
D O W E L
FRONT VIEW
hex bolts
(13mm)
brackets
brackets
BACK VIEW
4
Retighten
Dowel Screws
and repeat on the other
end of the screen dowel.