Draper Clarion Istruzioni per il montaggio - Pagina 2
Sfoglia online o scarica il pdf Istruzioni per il montaggio per Schermo di proiezione Draper Clarion. Draper Clarion 2. Permanently tensioned projection screen
Anche per Draper Clarion: Istruzioni per il montaggio (2 pagine), Istruzioni per il montaggio (4 pagine), Istruzioni per il montaggio (4 pagine), Istruzioni per il montaggio (3 pagine)
Clarion by Draper
Surface Preparation
① Move frame assembly out of the way, unroll viewing surface and place on
smooth/clean surface. (Orient viewing surface so that folded side of hem is
visible.)
② Insert plastic tubing inside pocket formed by hem on all 4 edges of viewing
surface (see Fig. 7).
③ Carefully slide surface retention extrusion (rounded edge visible) along
hem and onto surface on all four edges of fabric (see Fig. 8).
Caution: Do not allow fabric to snag on the ends of the extrusions.
If the screen fabric is not parallel with the surface retention extrusion,
then it may slit and tear during installation.
Please Note: To make this step easier, pinch the end of the pocket closed
before sliding it into the surface retention extrusion.
Surface Retention
Extrusion
Back of
Viewing Surface
④ Surface retention extrusion should extend beyond edge of viewing surface
equally at both ends.
⑤ Verify that all surface retention extrusions are installed with rounded edge
visible and are centered on surface material.
Surface to Frame Assembly
① Return frame onto clean surface, face down, and drape completed surface
assembly over completed frame profi le with rounded edge of surface
retention extrusion visible.
② Insert any side of surface to notch #1 on corresponding side of frame
extrusion (see Fig. 9).
Viewing
Surface
Fabric Attachment Extrusions
③ Insert opposite side of surface to notch #1 of frame extrusion.
④ Repeat steps 2-3 with remaining edges of surface.
⑤ Ensure surface retention extrusions are centered lengthwise in tension
slots on all 4 edges of surface.
⑥ If additional tension is desired or required over time, adjust surface one
edge at a time to tension notch #2.
Please Note: It is not necessary to adjust more than one edge at a time to
increase surface tension.
Mounting Screen to Wall
① Determine height at which screen is to be mounted.
Please Note: Top edge of screen frame will be located 1" above mounting
bracket hole centerline when mounted to wall.
② Mark hole centerline so that both wall brackets can be mounted parallel
and at equal height.
③ Install wall brackets so that the outermost edges are safely within overall
length of the aluminum frame extrusion to allow for minor horizontal screen
Figure 7
Plastic Tubing
Back of
Viewing Surface
Figure 8
Surface
Retention
Extrusion
Figure 9
www.draperinc.com
adjustments. Installer is responsible for providing attachment hardware.
④ Position screen slightly above wall brackets (see Fig. 10).
Wall
Wall brackets
supplied with
screen. Installer is
responsible for
ensuring appropriate
screws/bolts are used.
⑤ Lower screen until it engages over wall brackets. Center screen horizontally
on brackets as necessary.
Please Note: Make sure screen is installed level.
*Viewing surface is approximately ¼" from wall.
Clarion (Exploded Rear View)
Clarion Frame—
Side Detail*
Allow .125" min. from top edge
of wall bracket to ceiling or
bounding box to allow frame
to slide over wall bracket.
3
1
/
"
16
1
5
/
"
8
C L
Corner Reinforcement Kit
A Corner Reinforcement kit is required for fl own screens with a viewing
area of 10' (120") or wider.
① Install frame per Clarion instructions.
② Align corner reinforcement to each corner of screen frame & mark hole
locations. Remove reinforcements to allow clear view of marked hole
locations.
③ Drill pilot holes through frame at each marked hole location with supplied
#20 drill bit (16 holes).
④ Place reinforcements back onto frame at each corner.
⑤ Thread the supplied #10-16 x .750" Type AB self threading screws through
reinforcements and into pilot holes in frame.
⑥ Thread each of the four screws into each reinforcement plate BEFORE
tightening them down completely to aid in alignment.
Please Note: To avoid damage to the frame corners, be sure to support a
minimum of two (2) corners when lifting or transporting screen.
(765) 987-7999
Page 2 of 2
Figure 10
Surface
Plastic
Retention
Tubing (4)
Extrusions (4)
Viewing
Surface