Draper Premier PRE-29 Istruzioni per l'installazione - Pagina 3

Sfoglia online o scarica il pdf Istruzioni per l'installazione per Schermo di proiezione Draper Premier PRE-29. Draper Premier PRE-29 4. Electric projection screen

Draper Premier PRE-29 Istruzioni per l'installazione
Premier by Draper
Case Dimensions
1
Mounting
5
/
"
4
hole
13
1
/
"
16
7
5
/
"
8
7
/
" dia.
8
1"
electrical
connection
15
/
"
hole
16
Optional Ceiling Opening Trim Kit
(Dims-Side View)
8"
1
2
/
"
8
4"
6
Built-in Low Voltage Motor: Switch-to-Motor—Dry Contacts or Data Cable connection
Please Note: This Splitter/Jack
is located inside the motor-end
endcap of your screen. To ac-
cess, remove access panel from
endcap.
Data Cables to switches or
to additional motors can be
plugged into any of the three
open jacks.
2
1
/
"
8
Types of Installation
2
1
/
"
16
1
1
/
"
16
3
/
"
4
Back of wall switch.
U
D
C
P
O
O
W
M
N
M
O
N
www.draperinc.com
Tab-Tension Adjustment Procedure
 Determine which side requires adjustment.
 Secure dowel with one hand.
Caution: Do not touch or bend surface.
 Using Phillips-head screwdriver,
depress spring-loaded adjustment screw
(see drawing) and slowly turn clockwise to
tighten tension, or counterclockwise to
loosen tension. The screw adjusts in
¼ turn increments. Adjust only one
increment (¼ turn).
 If problem is not corrected, leave screen in
position for 24 hours to allow surface
material to stretch into position.
 If problem still is not corrected, repeat steps 2 and 3.
Wall
Appropriate hardware
provided by installer.
Motor Data Cable
plugged in here
5V
UP 5V COM DWN
(765) 987-7999
Page 3 of 4
for Premier
Dowel
Suspended
Appropriate hardware
provided by installer.
If using "S"
Hooks )by
others), be
sure to crimp
both ends
of the "S"
Hooks.
Please Note: 5V DC must be
connected to be able to set
limits using the wall switch.
Please Note: Although both Dry
Contact and Data Cable connections
are shown, you should only use one
connection type per motor.
Tensioning
Cable
Adjustment
Screw