Draper Profile+ Istruzioni per il montaggio - Pagina 2

Sfoglia online o scarica il pdf Istruzioni per il montaggio per Schermo di proiezione Draper Profile+. Draper Profile+ 3. Permanently tensioned projection screen

Profile
Permanently Tensioned Projection Screen
For Hook and Loop Fabric Attachment:
1-A. Insert sliding Hook & Loop attachments
into all four (4) sections of the frame
(See Fig. 1-A).
Insert Sliding
Hook & Loop
Attachment
For all fabric attachment methods:
2. Insert the Frame sections onto the corners pieces
(See fig 2.) and secure them with provided screws.
5. Carefully lay the screen fabric down on a clean surface. Place
the assembled frame in the center of the fabric (see Fig. 4).
6. Slide the Hook & Loop or Snaps along the frame until they are
evenly spaced.
7. Pull the edge of the screen fabric and wrap it around the frame
(see fig 5). Attach the screen fabric on all four (4) sides.
8. Carefully, turn the entire screen assmbly over and inspect.
Adjust the position of the sliding fabric attachments to remove
any wrinkles.
Figure
(4)
Screen Fabric
Figure
1 - A
Figure
(2)
Back of
.
o x
p r
A p
3 "
For Snap Fabric Attachment:
i n g
a c
S p
1-B. Insert sliding snap attachments into
all four (4) sections of the frame
(See Fig. 1-B).
Insert
Sliding
Snaps
For Larger sizes requiring Vertical support:
3. When assembling a large frame, use the two (2) vertical support
connectors on the top and bottom sections (see fig. 3). Connect
these sections together with the Vertical Support Bar.
Secure all frame sections and connectors with provided screws.
Figure
(5)
Figure
Wrap the fabric
around and attach to frame
Assembled Frame
centered on
Screen Fabric
(Viewing Surface Down)
Page 2 of 4
Figure
1- B
(3)