Draper FlexShade NEXD Istruzioni Installazione e funzionamento - Pagina 7

Sfoglia online o scarica il pdf Istruzioni Installazione e funzionamento per Arredamento per interni Draper FlexShade NEXD. Draper FlexShade NEXD 8. Clutch-operated small and large hardware
Anche per Draper FlexShade NEXD: Istruzioni per l'installazione e il funzionamento (6 pagine), Manuale di istruzioni (8 pagine), Istruzioni Installazione e funzionamento (8 pagine), Istruzioni Installazione e funzionamento (10 pagine), Manuale di istruzioni (12 pagine)

Draper FlexShade NEXD Istruzioni Installazione e funzionamento
Bottom-Up FlexShade
Small and Large Hardware

Section 11 - Adjusting Fabric Tracking

1. Slide both ends of the draw cable close to
the attachment stud flat washers.
2. Raise the shade to its fully closed position
and ensure that the hem bar is centered in
the window.
3. Lower the shade to its fully retracted
position.
4. Move one or both of the Draw Cable
Attachment Studs to the left or right so
that each run of the Draw Cable is hidden
behind the front section of the cable.
5. Lower the shade to its fully retracted
position and observe the tracking on the
fabric roller.
6. Adjust the tracking by loosening the
smaller screw, and then raising or
lowering the fabric roller with the larger
screw, as needed
.
(Fig. 11)
Section 12 - Attaching Fascia
1.
Position fascia flush
to edge of bracket
and/or butted to
endcap cover.
2.
Snap firmly
into place.
!
Fascia is not fully
seated until it clicks
into place on both ends.
Once in place, check
for secure fit.

Section 13 - Surface Headbox or Pocket Headbox

1. Snap endcap covers onto endcaps.
2. Place endcaps into back/top portion of wall/ceiling
extrusion of pocket headbox. Using pre-drilled holes in endcaps, mark the headbox
for drilling.
3. Drill holes in back or top, depending on whether you will be mounting the headbox
to the wall or ceiling, or in a pocket above.
4. Attach endcaps and Surface Headbox back/top or Pocket Headbox extrusion to
wall, ceiling, or pocket using mounting hardware appropriate for site conditions.
Please Note: Small size pocket style headbox requires securing closure panel to
endcap with provided screw.
5. Install shade
.
(Section 4)
6. Attach ceiling/wall
headbox fascia, or pocket closure
(surface)
Note on surface style headbox: Fascia is not fully seated until it clicks into place on
both ends. Once in place, check for secure fit. If not secure, secure with appropriate
fastener
.
(not included)
NEXD,
®
7. Tighten the smaller screw to lock the
position of the roller.
8. Re-test the fabric tracking and re-
adjust if needed.
9. Set the upper- and lower-limits of the
unit's operating range
(Section 14)
10. Ensure that the hem bar does not
contact the fabric bundle, operator
roller, pulleys, etc. throughout its
range of operation.
11. Trim any excess draw cable from
both ends.
12. Click the hem bar pulley caps into
place
.
(Fig. 12)
Please Note: Installer must ensure that
the cable is properly routed through
the pulleys before the pulley caps are
installed.
(Top Roller)
1
2
headbox or into pocket
(surface)
.
(Fig. 14)
1.
Loosen smaller
screw to
adjust
tracking.
.
Figure 12
Figure 13
Small Pocket Headbox
Figure 14
STEP 1
STEP 2
STEP 3
Secure to Endcap
with screw.
page 7 of 8
Figure 11
2.
Raise or lower
fabric roller
with larger
screw.
1
2
Large Pocket Headbox
STEP 1
STEP 2
STEP 3