Drawell DW-LBI-300 Manuale d'uso - Pagina 4
Sfoglia online o scarica il pdf Manuale d'uso per Accessories Drawell DW-LBI-300. Drawell DW-LBI-300 9. Biochemical incubator
Anche per Drawell DW-LBI-300: Istruzioni (11 pagine)
2) The distance between the equipment and the wall must be more than 10cm and the
button operation position shall be reserved on the right side.
3) Avoid direct sunlight and keep away from heating equipment;
4) Place the equipment on the horizontal ground, lock the front caster to make the box flat.
5) Turn on the 220V/50Hz power supply and it should be grounded. The equipment
shell should be grounded reliably and placed in a sheltered place from the sun, cool
and ventilated.
IV. Operation Method
Panel:
Instrument operation:
1) After the meter is powered on, if the last program has not finished running, it will
continue to run at the breakpoint of the last program. In the normal state, the upper row
will display the measured temperature and the lower row will display the temperature set
value or the remaining time (countdown will start when the set temperature is reached).
Output state will be displayed on both sides (the icon will display when there is output).If
the running program finished, flashing "STOP" will display in the lower row ,indicating that
it is in the STOP state. Press the "" key for 0.5 seconds to restart the meter. There will
be a beeping reminder at the end of timing, press the ""key to eliminate the sound.
2) Long press " " key for 5 seconds in the running state, the lower row alternately
displays the temperature setting value and "AT" prompt, that means entering the heating
PID self-tuning state. During the self-tuning state, the refrigeration and timing are stopped
Drawell International Technology Limited
Web : www.drawell.com.cn
Tel: +86-023-63268643
Email : [email protected]