Drazice NADO 300/20v11 Manuale operativo e di installazione - Pagina 6
Sfoglia online o scarica il pdf Manuale operativo e di installazione per Scaldabagno Drazice NADO 300/20v11. Drazice NADO 300/20v11 10. Storage tanks
4 IMPORTANT NOTICES
We recommend to start up the heating circle before commissioning and to clean possible dirts
caught in the filter and after this the system would be fully functional.
Recommended operating pressure of hot water circle is 0.4 MPa. We recommend installing
return valve and an expansion vessel (min. 4 % of hot water in pipeline) on hot water outlet
to eliminate back pressure impacts.
The reservoir is possible to use only in compliance with conditions stated on performance plate
and with instructions for wiring. It is also necessary to observe terms for connection stipulated
by some local electrical and water companies as same as manual for assembling and operation
besides statutory accepted national regulations and standards.
Shut down the reservoir cold water intake if you are not using the reservoir for longer
than 24 hours or if the object with the heater is without presence of any person.
- 6 -