Drazice OKC 400 NTRR/1MPa Manuale - Pagina 9

Sfoglia online o scarica il pdf Manuale per Scaldabagno Drazice OKC 400 NTRR/1MPa. Drazice OKC 400 NTRR/1MPa 12. Indirect water heaters
Anche per Drazice OKC 400 NTRR/1MPa: Istruzioni per l'uso e l'installazione (12 pagine)

Drazice OKC 400 NTRR/1MPa Manuale
Disposal of Packaging Material
For the package, in which the water heater was delivered, the service fee for back taking and utilisation of the
packaging material was paid.
The service fee was paid in accordance with Act No. 477/2001 Coll., as amended by later regulations of EKO-KOM
a.s.
Company client number is F06020274.
Dispose of the water heater packages in a location determined
as the waste storage by the town.
Disposal of old water heater
After operation termination, disassemble and transport the dead and
unserviceable heater
to a waste recycling centre (collection yard), or to a bulk waste collection yard.

14. ASSEMBLY GUIDE FOR ZIP-FASTENER INSULATION

Only concerns heaters with the capacity of 750 and 1000 litres
Two people are enough to implement the assembly; three people are required for larger boilers; the assembly
must be implemented in areas with the temperature of at least 18
If the insulation includes tank bottom insulation, the latter must be mounted first. Consequently, the
insulation is inserted around the boiler; pre-pressed insulation openings must be respected.
By slight pull in the direction of the arrows, pull both sides of the zip-fastener insulation so that (as shown on
Fig. 6) the insulation does not slide and the insulation holes sit on the boiler inlets and outlets.
It must be secured that before closing, both halves of the zip-fastener were not further than 20 mm apart (see
Fig.7). No foam shall get into the zip-fastener on closing.
After the insulation coat is properly mounted and the zip closure closed properly, insert the top lid made of foam
material and cover it with either a foil cover or a plastic lid. It is also possible to glue the outlet caps to connection
places (see Fig. 8). The insulation may only be stored in dry storage places.
We take no responsibility for damages caused by not respecting this guide.
o
C.
9