It is necessary to check the safety valve each time before putting it into operation. It is
checked by manual moving of the membrane from the seat, turning the make-and-break
device button always in the direction of the arrow. After being turned, the button must click
back into a notch. Proper function of the make-and-break device results in water draining
through the safety valve outlet pipe. In regular operation, such a check needs to be carried
out at least once a month, and after each shutdown of the tank longer than 5 days. Water
may be dripping off the drain pipe of the safety valve; the pipe must be open into the air,
pointed down; environment temperatures must not drop below zero. When draining the
tank, use the recommended drain valve. First of all, close water inlet in the tank. Find
necessary pressure values in the following table. For proper safety valve operation, a
backflow valve shall be mounted on the inlet pipes, preventing spontaneous heater draining
of the tank and hot water penetration back into the water main.
Required pressures - Table 2 - We recommend that the hot water distribution from the tank is as short as
possible in order to reduce heat losses
SAFETY VALVE STARTING
PRESSURE (MPa)
Table 2
Connection of tank exchanger (left, right) and fixture armature at cold water inlet.
Figure 5
ACCEPTABLE OPERATING OVER-
PRESSURE OF THE TANK (MPa)
0,6
0,7
1
O - bleeder valve
U - shutoff valve
P1 - Safety valve with backflow flap
P2 - safety valve for heating circuit
M - Manometer
Z – Test valve
V - Drain valve
Connection on cold water inlet must comply with the
standard effective in the country of installation.
MAX COLD WATER
PRESSURE IN PIPING
0,6
0,7
1
(MPa)
up to 0.48
up to 0.56
up to 0.8