Daikin VAM650HVE Manuale operativo - Pagina 18

Sfoglia online o scarica il pdf Manuale operativo per Ventilatore Daikin VAM650HVE. Daikin VAM650HVE 20. Total heat exchanger, heat reclaim ventilator

Daikin VAM650HVE Manuale operativo
 Recommended replacement cycle of
consumables
[Note: The replacement cycle is not the same as
the warranty period.]
• T able 2. "Replacement Cycle" Lists
Name of Main Part
Air fi lter ( )
High-performance filter
(optional accessory)
Name of Main Part
Heat exchange element
NOTE 1
• This table indicates main parts. See the
maintenance and inspection contract or details.
NOTE 2
• This replacement cycle indicates the recommended
duration until the need arises for replacement; this
ensures the product is operational for as long as
possible.
• Use it for appropriate maintenance design
(budgeting parts replacement cost,etc.).
If the unit is used for a building for The Building
  
Sanitation Act (Former Buiding Managment Act),
periodic inspection is required.
For details, contact your dealer or the contact center.
Any failures cause by unauthorized vendors
performing dismantling or internal cleaning of the unit
will not be covered by the warranty.
 Moving and disposing the unit
• Contact your dealer or the contact center for
moving and reinstalling the total heat exchanger
due to relocation, etc., as this requires technical
expertise.
• Disposal of the product should be done in
accordance with the relevant local regulations.
 Inquiry
• For after-sales service,etc.,contact your dealer
or the contact center.
11
Inspection
Replacement
Cycle
cycle
damaged
1 year
1 year
Inspection
Replacement
Cycle
cycle
2 years
6 to 10 years