Switch Settings:

Provide 10 bits switch for function setting. 1 ~ 8 alarm enable
switch setting. ON show enable ,9 show PWR1 alarm setting .10
show PWR 2 alarm setting . ON show alarm state.
Installation:
Before installation, confirm that
installation require, including the power needs and abundant space.
whether it is close to the connection equipment and other
equipments are prepared or not.
Installation require as below
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power need: Redundant, dual 24VDC (12VDC~48VDC)
6. Environment: -40 to 75°C
Storage Temperature: -45°C to 85°C
Relative humidity 10% to 95%
DIN-Rail Installation
In order to use in industrial environments expediently,IES308-2F
adopt 35mm DIN-Rail installation, the installation steps as fellows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be suitability
or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will insert into place as shown
below.