3onedata IES3020-4GS-4F-P Manuale d'uso - Pagina 3
Sfoglia online o scarica il pdf Manuale d'uso per Router di rete 3onedata IES3020-4GS-4F-P. 3onedata IES3020-4GS-4F-P 4. Ies3020-4gs series industrial ethernet switch
remote switch's RX(receive) port; RX(receive) port connect
remote switch's TX(transmit) port.
The optical fiber connection supports the line to instruct
enhance the reliability of network effectively.
Suppose: If you make your own cable, we suggest labeling
the two sides of the same line with the same letter (A-to-A
and B-to-B, shown as below, or A1-to-A2 and B1-to-B2).
1000Base SFP fiber port(mini-GBIC)
1000Base-X SFP fiber port adopts gigabit mini-GBIC
transmission, can choice different SFP module according to
different transfer distance. Fiber interface must use for pair,
TX port is transmit side, must connect to RX (receive side).
The fiber interface support loss line indicator.
Suppose: If you make your own cable, we suggest labeling
the two sides of the same line with the same letter (A-to-A
and B-to-B, shown as below, or A1-to-A2 and B1-to-B2).
【LED Indicator】
LED indictor light on the front panel of product, the function
of each LED is described in the table as below.
System indication LED
LED
State
Description
Power is being supplied to
ON
power input PWR1
P1
Power is not being supplied
OFF
to power input PWR1
Power is being supplied to
ON
power input PWR2
P2
Power is not being supplied
OFF
to power input PWR2
When the alarm is enabled,
ON
power or the port's link is
Alarm
inactive.
Power and the port's link is
OFF
active, the alarm is disabled.
System is not running well
ON/OFF
Run
System is running well
Blinking
ON
Port connection is active
Link/ACT
Data transmitted
Blinking
(1~16/
G1~G4)
Port connection is not active
OFF
【Installation】
Before installation, confirm that the work environment meet
the installation require, including the power needs and
abundant space. Whether it is close to the connection
equipment and other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat
fountainhead or the area where in intense EMI.
2. Examine
the
cables
and
plugs
requirements.
3. Examine whether the cables be seemly or not (less than
100m) according to reasonable scheme.
4. Power: 12 ~ 48VDC power supply.
5. Environment: working temperature: -40~75℃
Storage Temperature: -40~85℃
Relative humidity 5%~95%
DIN Rail Installation
- 3 -
In order to use in industrial environments expediently, the
product adopt 35mm DIN-Rail installation, the installation
steps as below:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position is
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the
stiff metal spring.
4. The DIN-Rail attachment unit will snap into place as
shown below.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before
cable laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable
laying;
that
installation
3. The required cable specification, quantity, direction and
laying position need to match construction requirements,
and cable length depends on actual position;
4. All the cable cannot have break-down and terminal in the
middle;
5. Cables should be straight in the hallways and turning;
6. Cable should be straight in the groove, and cannot
beyond the groove in case of holding back the inlet and