Anzzi Anzzi SB-AZ03CD Manuale di installazione e funzionamento - Pagina 9

Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Apparecchiature per il bagno Anzzi Anzzi SB-AZ03CD. Anzzi Anzzi SB-AZ03CD 14. Shower base

Anzzi Anzzi SB-AZ03CD Manuale di installazione e funzionamento
ATTENTION
The following steps are for the rectangle
shower tray.
STEP 1
Ensure that the floor and the studs are at right angles.Provide a 5"×5" opening in the subfloor
for the drain. The 2" PVC waste pipe should extend above the surface of the sub-floor according
to the drain installation instructions and the height of the Shower Tray.
Mark unit position on floor and through drain opening.
Mark the locations of the studs on the flange of the base.
These marks are used to verify base location after drain is installed. (Fig 1)
The pipe height (A) shall be determined according to the products on hand.
C
5"
(12.7 cm)
A
7