Anzzi SP-AZ8097 Manuale di installazione - Pagina 10
Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature per il bagno Anzzi SP-AZ8097. Anzzi SP-AZ8097 16.
INSTALLATION (SHOWER HEAD)
Figure 3
Step 3A
Place and align the top shower panel with the pre-drilled holes on the top side of the wall
mounted panel.
Step 3B
Using the screws and washers provided, secure the top panel with the wall mounted panel.
Step 3C
Once the top panel is set in place you can continue with the wall mounting process.
PERFECTION IS OUR TRADITION™
pg. 8