Anzzi SB-AZ011WC Manuale di installazione e funzionamento - Pagina 10

Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Prodotto idraulico Anzzi SB-AZ011WC. Anzzi SB-AZ011WC 14. Shower base
Anche per Anzzi SB-AZ011WC: Manuale di installazione e cura (8 pagine)

Anzzi SB-AZ011WC Manuale di installazione e funzionamento
STEP 2
Place the tray into the designated position
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the tray and place marks on the studs
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 3
Drill 3/16" holes at all stud locations on top
flanges.(Fig 3)
IMPORTANT: Drill 3/16" clearance holes
into flanges only. Do not drill 3/16" holes
directly into studs. Drill chuck can damage
base. Use an extended bit holder to reduce
risk of drill chuck hitting base.
Fig. 2
Fig. 3
8