Anzzi SD-AZ03-01 Manuale di installazione e cura - Pagina 2

Sfoglia online o scarica il pdf Manuale di installazione e cura per Prodotto idraulico Anzzi SD-AZ03-01. Anzzi SD-AZ03-01 10. Shower door

Anzzi SD-AZ03-01 Manuale di installazione e cura
Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed
parts are included in the package by marking all the components on the "Detailed Diagram of
Shower Door Components". Examine boxes and packages for shipping damage. If the unit has
been damaged, has a finishing defect, or is missing parts, please contact our customer support
department within 5 business days of the delivery date. Please note that We will not replace
any damaged products or missing parts free of charge after 5 business days or if the products
has been installed. Feel free to contact us if you have any questions..
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and we are not
responsible for code compliance standards for your project and will not accept any
returns.
3. Prior to installation, ensure that the installation surface is leveled and solid and will be able to
support the total weight of the unit. Also, make sure the walls are at right angles. Irregular
installation surface level or improper angle of side walls will result in serious problems for your
installation. Please, note that some adjustments and drilling might be necessary during the
installation process.
4. This unit has to be installed against a finished floor and walls.
5. Please, NOTE! This door does not have out-of-plumb adjustment. Make sure your walls are
at right angles.
Caulk
Level

Tools Required

Tape
Measure
Pencil
Caulk
Electric
Gun
Drill
Phillips
Drill bit
(Ø 5/16")
Screwdriver
Hammer
Drill bit
(Ø 1/8")
Knife
2