INSTALLATION SEQUENCE
Fig. 1.8
General view of the end
wall and location of the
angles for fastening of
polycarbonate.
bolt
angle
STAGE 2
Installation of runners
on the end wall.
Assembly is carried out
The assembled end wall is
according to the fig. 2.
installed in the horizontal
plane. To arcs 4 and 20
and girders of the end wall
are
alternatively
end runners 2к и 2кн align
the side flanges of shapes.
2кн
Runners deviate from the
2к
14
-
places of
installation of angles
for further fastening
of covering to an en
vertical under their own
weight and abut against
side walls of shapes of arcs
4 (until the next operation).
joined
2к
2кн
2кн
2к
Fig. 2
INSTALLATION SEQUENCE
STAGE 3
Assembly of the power arc
Assembly of the power
arc is carried out in a
horizontal plane similar to
the assembly of the end
wall.
STAGE 4
End section assembly.
Assembly is carried out
according to the fig.4.1.
The assembled power arc
is brought to the end wall
with the installed runners,
is raised to the height
of the end runners and
joined with their upper
ends. It is recommended
to connect the outermost
and middle runners first.
For the initial fixation
of the power arc on the
runners, participation of
three people is required
for holding of the frame.
укос
2к
Fig. 4.1
fig 4.2
Installation of longitudinal
укос
stiffness side braces.
Manual
2кн
15