Cascade 20E Manuale di istruzioni per l'installazione - Pagina 6
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Utensile elettrico Cascade 20E. Cascade 20E 14. Non-sideshifting & sideshifting clamps
Anche per Cascade 20E: Manuale di istruzioni per l'installazione (11 pagine)
I
NSTALLATION
5
Mount Clamp on truck carriage
A
Center truck behind Clamp.
B
Tilt forward and raise carriage into position.
C
Engage top mounting hooks with carriage.
Make sure centering tab engages a notch
on the top carriage bar. NOTE: Centering
tab can be oriented in 4 different positions
to center the Clamp (see illustration).
D
Lift Clamp 2 in. (5 cm) off pallet.
ITA Class II – 0.60–0.66 in. (15–17 mm)
ITA Class III – 0.72–0.78 in. (18–20 mm)
ITA Class II – 0.32–0.36 in. (8–9 mm)
ITA Class III – 0.39–0.43 in. (10–11 mm)
6
Install and engage lower hooks
Slide hook up
to engage
bar, install
pin in locked
position.
(upper hole.)
4
Engage upper hooks
and centering tab
Truck
Carriage
QUICK-CHANGE TYPE
Lower
Carriage
Bar
e
®
a d
s c
c a
- 1
1 4
5 5
6 7
C -
C
CL0243.ill
CL0242.ill
Inspect hooks for
excessive clearance.
(Reverse guides to reduce
clearance – See Step 2.)
Tap tight into position.
3/16 in.
(5 mm)
Max.
SD0065.ill
Tighten Capscrews:
Class II / III Mounting – 165 ft.-lbs. (225 Nm)
A
C
Centering Tab
Positions
1
2
3
4
BOLT-ON TYPE
Lower
Carriage
Bar
S T
J U
A D
SD0066.ill
B
CL0241.ill
C