3P Technik TCA5000950 Manuale di istruzioni per l'uso - Pagina 7
Sfoglia online o scarica il pdf Manuale di istruzioni per l'uso per Controllore 3P Technik TCA5000950. 3P Technik TCA5000950 12. 3p mains water top-up set compact
debris will quickly clog any filters and may damage the pump's internal parts and the pump's
impellers, prematurely shortening the operational life of the system, and invalidate pump and other
component warranties. The potable feed pipework to the solenoid must also be clear and free of
debris.
Maintenance Advice – It is good practice to gently clean the probe at intervals of three years or
whenever checking the tank.
Operation
Control Unit Operation
When the Control Unit is powered up:
High Water Level: If the Level Probe is immersed in rainwater, (i.e. below the rainwater level in the
tank) then the green LED remains on, there is power to the pump socket (so a connected pump will
then run) and the solenoid valve is closed (i.e. not topping up).
Low Water Level: If the rainwater level falls below the Level Probe a top-up cycle will begin. The green
LED flashes and the Solenoid Valve opens to allow mains water to flow via the Tundish and so into the
rainwater tank. During the top-up cycle the pump will be turned off (power to the pump is isolated
during topping up).
TCA5000950 v1.3
www.3ptechnik.co.uk
Test button: Pressing this when the Solenoi
Solenoid Valve.
Stop/Reset button: Closes the solenoid valv
flash.
A second press will reset the controller to its
28-Sept-2021
Page 7 of 12