Dunkirk 95M-200 Manuale d'informazione per l'utente - Pagina 4

Sfoglia online o scarica il pdf Manuale d'informazione per l'utente per Caldaia Dunkirk 95M-200. Dunkirk 95M-200 8. Natural or propane gas-fired modulating condensing boiler set-up and operation
Anche per Dunkirk 95M-200: Manuale d'informazione per l'utente (6 pagine), Manuale rapido (12 pagine)

1. STOP! Read the safety information above in this manual.
2. Set the thermostat to the lowest setting.
3. Turn off all electric power to the appliance.
4. This appliance is equipped with an ignition device which auto-
matically lights the burner. DO NOT TRY TO LIGHT THE BURNER
BY HAND.
5. Remove the front jacket panel.
6. Turn the gas control valve clockwise
the valve should be perpendicular to the pipe in the "OFF" position.
7. Wait five (5) minutes to clear out any gas. Then smell for gas,
including near the floor. If you smell gas, STOP! Follow "B" in the
safety information above in this manual. If you don't smell gas, go
to the next step.
8. Turn the gas control valve counterclockwise
tion. The handle of the valve should be parallel to the pipe in the
"ON" position.
9. Replace the front jacket panel.
10. Set the thermostat to the desired setting.
11. Turn on all electric power to the appliance.
II - OPERATING INSTRUCTIONS
Control Valve "ON"
to "OFF". The handle of
Control Valve "OFF"
4
to the "ON" posi-