Dunster House ADAM II H4-1824ASH Manuale di installazione - Pagina 14

Sfoglia online o scarica il pdf Manuale di installazione per Case da giardino Dunster House ADAM II H4-1824ASH. Dunster House ADAM II H4-1824ASH 15.

STEP 14: FASCIA BOARD AND DIAMOND FINIAL
Items:
4x
ST-PT16701025.75.75 (Fascia board)
2x
ST-PT1670120 (FINIAL)
20x 35mm SCREW
Principle of installation - Front views
Fascia board
10mm
35mm SCREW
STEP 15: PANEL JOINT TRIM
Items:
1x
ST-PT19451855 (SIDE)
1x
ST-PT1945250 (FRONT)
1x
ST-PT19452080 (REAR)
12
35mm SCREW
15a) Position the trim over the joint
ensuring the distance between the joint
and edge of the trim is the same.
15b) Use 8x 35mm screws for
ST-PT19451855 and ST-PT19452080.
15c) Use 4x 35mm screws for
ST-PT1945250.
Assembly Steps
14a) Position the fascia boards to the correct position as shown in the
diagram below. Fascia boards should overhang the roof boards by 10mm.
Fix each fascia board to the wind brace by using 4x 35mm screws.
14b) Position the diamond finials to correct position as shown in the
diagram below. Fix each diamond final onto the wind brace by using 2x
35mm screws.
35mm SCREW
10mm
Diamond finial
Pre-drill parts before fixing with screws
Position of fascia boards
and diamond finials
FRONT
Page 14