Dunster House ADAM III H4-2424ASH Manuale di installazione - Pagina 13

Sfoglia online o scarica il pdf Manuale di installazione per Case da giardino Dunster House ADAM III H4-2424ASH. Dunster House ADAM III H4-2424ASH 15. Shed-2.4m x 2.4m(8ft x 8ft)

STEP 12: WIND BRACE
Items:
4x
ST-PT35351210 (Front+Rear)
2x
ST-PT35352370 (Side)
28x 35mm SCREW
Principle of wind braces installation
Front view
Side view
Side wind brace
Front wind brace
STEP 13: FELT
Items:
1x
Felt
400x 10mm CLOUT NAIL
Principle of felt installation
Felt layer 2
80mm
Assembly Steps
Pre-drill parts before fixing with screws
12a) Position the wind braces as shown in the diagram below. Make sure that they
are flush with edge of the roof board.
12b) Fix each wind brace by using 35mm screws. Use 4 screws for each front and
rear wind brace. Use 6 screws per each wind brace for the side. Refer to the image
below for more information.
35mm SCREW
Front wind brace
35mm SCREW
Rear wind brace
Pre-drill parts before fixing with screws
13a) Place the Felt layer 1 and 2 as is shown in the diagram below. Keep an
overhang of 80mm on each side. Fix felt onto roof board and then fix
overlaps onto wind braces with the 10mm clout nails.
13b) Position the Felt layer 3 as is shown in the diagram below. This layer
needs to overlap layers 1 and 2 by 200mm. The Felt layer 3 might require
horizontal cut, if your overlap is too long. Fix the Felt layer 3 into felt layers
1 and 2 and then fix overlaps onto wind braces. Use 10mm clout nail for all
fixings.
80mm
80mm
10mm CLOUT NAIL
80mm
Position of wind braces
FRONT
Felt layer 1
Felt layer 3
80mm
Felt
Attaching of overlap
(Front view)
10mm COUT NAIL
(Distance between
nails approx. 70mm)
10mm CLOUT NAIL
200mm
Felt Layer 1
80mm
Page 13