Dunster House H4-2418DSHV2 Manuale di installazione - Pagina 15
Sfoglia online o scarica il pdf Manuale di installazione per Case da giardino Dunster House H4-2418DSHV2. Dunster House H4-2418DSHV2 16. Dad's shed i - 2.4m x 1.8m (8ft x 6ft)
STEP 14: FASCIA BOARD AND DIAMOND FINIAL
Items:
4x
ST-PT16701235 (Fascia board)
2x
ST-PT16701830 (Fascia board)
1x
ST-PT1680140 (FINIAL)
22x 35mm Screw
Principle of installation - Side view
Principle of installation - Front view
ST-PT1670120
STEP 15: PANEL JOINT TRIM
Items:
1x
ST-PT19451855 (REAR)
2x
ST-PT19451955 (SIDES)
1x
ST-PT19452055 (FRONT)
32x
35mm SCREWS
15a) Position the trim over the
joint ensuring the distance between
the joint and edge of the trim is the
same.
15b) Use 8x 35mm screws per
each trim and secure to the panel
frame.
Assembly Steps
14a) Position the fascia boards to the correct position as shown in the
diagram below. Fascia boards should be flush with the roof boards. Fix side
fascia boards to the wind brace by using 4x 35mm screws and use 3x
35mm screw per each of the front fascia boards.
14b) Position the diamond finials to correct position as shown in the
diagram below. Fix the diamond final onto the fascia boards by using 2x
35mm screws.
ST-PT16701830
ST-PT16701235
Pre-drill parts before fixing with screws
Position of fascia boards and
diamond finials
Pre-drill parts before fixing with screws
FRONT
Page 15