Freedom Bathtubs Chelsea APWMG015 Manuale di installazione - Pagina 3

Sfoglia online o scarica il pdf Manuale di installazione per Vasche da bagno Freedom Bathtubs Chelsea APWMG015. Freedom Bathtubs Chelsea APWMG015 6. Massage bathtub

General Information

Note: All tubs need to be leveled in its final resting position and have all feet touching
the ground.
It is advised to have tub onsite before preparing drain location.
Manufacturer reserves the right to change specs or features at any time.

Notice to Installers

THE FLEXIBLE DRAIN HOSE THAT IS INCLUDED WITH THIS UNIT IS FOR INSTALLATION
INTO AN OPEN FLOOR DRAIN ONLY. SUBSTITUTING THE EXISTING DRAIN SHOE FOR A
DIFFERENT ONE WILL NOT VOID THE WARRANTY AS LONG AS THERE NO DAMAGE OR
EVIDENCE OF MISUSE TO THE BASE

Electrical Parameters

Rated Voltage
110V~120v

Electrical Requirements

1 dedicated 10-2 line for water pump (line 1, ground and neutral)
110 volt, 30 amp GFCI breaker
There is a length of wire supplied to connect to power source

Plumbing Requirements

The unit is equipped with hot and cold, metal braided ½ inch water supply hose with
½ national pipe thread.
Need to install accessible hot and cold shutoffs with ½ -male national pipe thread
(not included).
Supply hoses are to connect from the manifold on the unit to the shutoff valves.
All water jet features are pre plumbed with reinforced braided flexible supply hose
All fixtures and fittings should be checked for tightness as they may have come loose
during transport. Access panel area advised.

Tub Installation

A. Water Head: One cold water supply pipe, one hot water supply pipe.
B. Drainage: The diameter of the drain should be (greater than or equal to) 40mm. This
drainage can be at a distance of 300-400mm from the location we show on the chart.
Frequency
Motor Power
0.745KW(1HP)/1.0KW
60HZ
5.5-6.5 Amps
Voltage of
Control Circuit
DC12V
1 |
P a g e
Rev 11.2016