Dupont IntegraTec XP 55 UXA Manuale - Pagina 9
Sfoglia online o scarica il pdf Manuale per Sistemi di filtrazione dell'acqua Dupont IntegraTec XP 55 UXA. Dupont IntegraTec XP 55 UXA 13.
5. Install Module to Skid
5.1
Pre-install feed and filtrate connector to the opening of skid
End cap assembly I Module: refer to Figure 7. DuPont™ IntegraTec™ XP 55 UXA - End Cap Assembly Type I Installation
Drawing, install two compressions coupling 2"(13) to the feed and filtrate opening of skid.
End cap assembly II Module: refer to Figure 8. DuPont™ IntegraTec™ XP 55 UXA - End Cap Assembly Type II Installation
Drawing, install silicon gasket (17, please refer to attachment 2) and compression coupling 2"(13) to feed and filtrate opening
of skid respectively.
End cap assembly III Module: refer to Figure 9. DuPont™ IntegraTec™ XP 55 UXA - End Cap Assembly Type III Installation
Drawing, install gasket of Victaulic Coupling 2" (17, please refer to attachment 3) and compression coupling 2"(13) to feed
and filtrate opening of skid respectively.
5.2
Connect Module to Skid
Lift up module to the skid, align module feed opening (Opening 3) to feed opening of skid, then align module concentrate
opening (opening 2) to concentrate opening of skid. If flexible tube is employed for the skid concentrate line, then only
need to move module concentrate opening to the same orientation of the flexible tube.
5.3
Fix module to skid properly to prevent falling off
Cautions:
For End Cap Assembly I module, bind module body with the closest skid frame properly.
5.4
Connect Feed Filtrate and Concentrate Openings
End cap assembly I Module: refer to Figure 7. DuPont™ IntegraTec™ XP 55 UXA - End Cap Assembly Type I Installation
Drawing. Move up compression coupling 2"(13) to the feed cap of the module (Opening 3) and tighten the coupling properly.
Move down compression coupling 2"(13) to the filtrate cap of the module (Opening 1) and tighten the coupling properly.
Install concentrate seal (9) to the concentrate opening of module (Opening 2), connect module concentrate opening and
skid concentrate opening and tighten the concentrate nut (11) properly.
End cap assembly II Module: refer to Figure 8. DuPont™ IntegraTec™ XP 55 UXA - End Cap Assembly Type II Installation
Drawing. Tighten Silicon Clamp (18, please refer to attachment 2) manually. Move down compression coupling 2"(13) to the
filtrate cap of the module (Opening 1) and tighten the coupling properly. Install concentrate seal (9) to the concentrate
opening of module (Opening 2), connect module concentrate opening and skid concentrate opening and tighten the
concentrate nut (11) properly.
End cap assembly III Module: refer to Figure 9. DuPont™ IntegraTec™ XP 55 UXA - End Cap Assembly Type III Installation
Drawing. Move up gasket of coupling 2"(17, please refer to attachment 3) to the feed cap of the module (Opening 3) and
tighten the coupling properly.
Move down compression coupling 2"(13) to the filtrate cap of the module (Opening 1) and tighten the coupling properly.
Install concentrate seal (9) to the concentrate opening of module (Opening 2), connect module concentrate opening and
skid concentrate opening and tighten the concentrate nut (11) properly.
5.5
Repeat Installation for remained modules
Repeat 2.1 to 3.4 until all modules be installed and fixed, rinse UF system with the guidance of the Ultrafiltration user manual.
Page 9 of 13
Install Module to Skid
Form No. 45-D04608-en, Rev 0
September 2023