Duratuf KIWI MK2A Manuale di istruzioni per il montaggio - Pagina 8

Sfoglia online o scarica il pdf Manuale di istruzioni per il montaggio per Deposito all'aperto Duratuf KIWI MK2A. Duratuf KIWI MK2A 18.
Anche per Duratuf KIWI MK2A: Manuale di istruzioni per il montaggio (16 pagine)

Duratuf KIWI MK2A Manuale di istruzioni per il montaggio
Step 1: Front Wall: Start at the left hand side. Position
the Wall Sheet with the LIP on the left hand
side. Ensuring the LIP is flush with side of the
Stud and the top of the Top Plate, tack in place.
Repeat with Wall Sheet on the right hand side
of doorway.
Step 2: Back Wall: Position the first Wall Sheet with
the LIP on the right hand side. Ensuring the LIP
is flush with the side of the Studs and the top of
the Wall Sheet is flush with the top of the Top
Plate, tack in place. Position the next Wall
Sheet with the LIP on the right hand side. Over-
lap as shown in (fig 1). Ensuring Wall Sheet is
flush with top of Top Plate, tack in place. Re-
peat with remaining sheet.
Step 3: End Walls: Lean Gable Wall Sheets against
the shed to form gable shape. With the LIP
flush with side of Stud tack in place ensuring
the bottom of the Wall Sheet is 10mm above
the bottom of the Bottom Plate. Tack on re-
maining Wall Sheets. Repeat with other gable
end. If fitting a window, nail in Window Studs
and Nog now. Refer to Window instructions.
Step 4: Nailing Off: Nail one 30mm Clout each side of the Rib (two per Pan) into the Top Plates and Bottom Plates. Nail
Wall Sheets to mid wall Nogs (one per pan). Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly
spaced.
Gable Ends: When nailing Gable Wall Sheets to the Top Plate, use a String Line. At the top of the gable nail two
30mm Clouts into the end of the Ridge Beam. This will stop it from twisting.
MK2A WALL CLADDING
8
TOP
FLUSH
EDGE
FLUSH