APlusLift HW-10KOH Manuale di installazione e funzionamento - Pagina 8

Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Colonne di sollevamento APlusLift HW-10KOH. APlusLift HW-10KOH 20. 2-post over head car lift 10,000lb capacity
Anche per APlusLift HW-10KOH: Manuale di installazione e istruzioni per l'uso (17 pagine)

APlusLift HW-10KOH Manuale di installazione e funzionamento
Step 3 (Installing Overhead Beam)
 Assemble overhead beam by connecting two short beam pieces with the connector.
Bolt two pieces the connector together
 Bolt the overhead beam to two columns. Make sure to bolt them together by installing
the bolts from inside the beam to avoid interference with the cables when operating the
lift.
Step 4 (Installing Equalizing Cables)
 Take the equalizer cables. Using vise grips and a socket, tighten the cable nut half way
down the threads.
 Stand in front of each carriage and find two holes on the top of the carriage.
 Take the threaded end (the end without nut) and run it up inside the carriage through
the front hole on the right side of the carriage. See figures below for cable routing. Do
not tighten cables at this time. Just start them on the treads.
8