Duro Dyne GBAC ROTO BONDER Manuale d'uso - Pagina 11

Sfoglia online o scarica il pdf Manuale d'uso per Apparecchiature industriali Duro Dyne GBAC ROTO BONDER. Duro Dyne GBAC ROTO BONDER 12. With circulating system

H. WEISS MACHINERY & SUPPLY

CIRCULATION SYSTEM SERVICING

The air is on but the adhesive is not circulating through the plumbing.
NOTE: Never force a valve handle. If a valve handle sticks, remove the valve and soak it in warm water.
Check the valve setting against the function chart to insure that the valves are set properly. If the valves
1)
are set properly, proceed to Step 2.
Check that number 2 valve is either in the up or down position. The circulation system will not work unless
2)
number 2 valve is in either position. Then proceed to Step 3.
3)
Check that the air-regulator unit is functioning according to the maintenance section of the Operating Instruc-
tions.
4)
Disconnect the air line that leads from the regulator to the pump. With the air line disconnected, check
the air supply. If there is no air leading into the pump, proceed to Step 5. If there proves to be a good air
supply, reconnect the air line and proceed to Step 6.
Disconnect the air line leading to the air regulator and check the air supply. If there is a good air supply to the regu-
5)
lator, replace the regulator. If there is no air supply to the regulator, the problem is independent of the GBAC.
6)
Fill a bucket with warm water. Place the GBAC input hose in the warm water and set the valves to fill the
trough from the drum. Activate the pump. If the water begins to pump into the trough, deactivate the
pump immediately and proceed to Step 8. If no water pumps to the trough, proceed to Step 7.
Fill a bucket with warm water. Place the GBAC input hose in the warm water and set the valves to fill the storage
7)
tank from the drum, Activate the pump with air. If the water begins to pump into the storage tank, deactivate
the pump immediately and proceed to Step 8. If the water does not circulate, proceed to Step 9.
8)
Remove the bucket of warm water and set the multi-port valves to circulate the adhesive from the drum
to the trough. If the adhesive will not circulate, proceed to Step 9.
9)
Set the multi-port valves so that adhesive circulates from the storage tank to the trough. Activate the
pump and observe whether adhesive is flowing into the trough. If there is an adhesive flow, proceed to
Step 12. If there is no adhesive flow, proceed to Step 10.
10) Disassemble the plastic union located beneath valve 2. Set the multi-port valves so that glue circulates
from the storage tank to the trough. If adhesive is pumped from the union, disconnect the air and replace
the valve assembly 1 and 2.
Note: It is important that all surfaces on the valves and the unions be free of glue residue before reassem-
bly.
If the glue is not pumped out from the union, disconnect the air, reassemble the union and proceed to Step
11 .
11) Set the multi-port valves so that the adhesive empties from the tank to the drum. Activate the pump. If the
adhesive exits the machine from the out port, replace valves number 3 and 4. (Order an assembly.) Close
valve number 5 if supplied, before disassembling valve number 3 and number 4. After replacing valve number
3 and number 4, open valve number 5. If the adhesive is not pumped out the exhaust port, proceed to Step
12.
12) Set the multi-port valves so that the trough is filled from the drum. Activate the pump. If adhesive is
pumped into the trough, replace valve assembly number 1 and number 2. If adhesive does not pump into
the trough, proceed to the pump service manual.
PHONE: (718) 605-0395 - www.hweiss.com
- -