Durr XR25 Manuale operativo - Pagina 5

Sfoglia online o scarica il pdf Manuale operativo per Convertitore multimediale Durr XR25. Durr XR25 14. Film processor

A

4. OPERATION

MORNING: Open water tap
EVENING:
Close water tap
Never let machine run when dry and
never without D/F roller in situ. Pull out
power plug on emptied machine.
Morning
• Open water tap
• Mains switch (G) ON
Warming up phase begins (approx,
20mins.)
Yellow indicator light (D) shines
Ready for use
The correct processing temperature
(28°C) is reached as soon as the green
indicator (C) lights up.
Film transport
• Film transport switch (A) ON
Red light indicator (B) lights up
Advice: Insert DURR cleaningfilm, order no.
1410-007-00- before starting the day's
processing by feeding in film at the
film entrance.
• Feed in film at film entrance.
Advice: Always feed in films straight and do
not have them overlapping, to avoid
bending or blocking the transportation.
• When the last film in a sequence has
been processed, switch OFF transport
switch (A).
Red light (B) goes out.
DÜRR
DENTAL
XR25
(A) Film transport switch ON/OFF
(B) Film transport ON
RED indicator lights up
(C) Ready for use
Green indicator lights up
(D) Warm up phase
Yellow indicator lights up
(G) Mains switch ON/OFF
Film-
Transport
B
C D
G
55