Elsema Intelligent Swing iS400D Manuale d'uso - Pagina 6
Sfoglia online o scarica il pdf Manuale d'uso per Apriporta del garage Elsema Intelligent Swing iS400D. Elsema Intelligent Swing iS400D 12. Swing gate opener with limit switch
C. INSTALLATION OF REAR BRACKET
Step 1: Before securing the rear bracket to the pillar check the front bracket can be welded to a solid point
on the gate leaf.
Fully close the gate.
Connect the rear and front brackets to the motor.
Hold the rear bracket onto the pillar with the calculated A and B values.
Move the motor in a vertical direction until the fixing zone is in a solid area of the gate leaf for
the front bracket.
Step 2: Then fix the rear bracket to the pillar.
D. INSTALLATION OF FRONT BRACKET
For proper operation, the front bracket should be fixed so the motor has the correct angle. Use Table 1 to
calculate the location of the front bracket.
4
B (mm)
190
200
210
220
230
240
250
260
270
iS400/iS400D/iS400Solar SWING GATE OPENER MANUAL
Table 1
E (mm)
1330
1320
1310
1300
1290
1280
1270
1260
1250