DUSKWORK VCO V2 Manuale di costruzione - Pagina 6
Sfoglia online o scarica il pdf Manuale di costruzione per Unità di controllo DUSKWORK VCO V2. DUSKWORK VCO V2 7.
| DUSKWORK.NET | Self-Tuning VCO V2 Build Guide
Step 9b: Connect the 6 pin ISP programmer as shown below. Red stripe should be toward
the top!
Note: -12v is at the bottom of the socket
Step 10: Time to plug in the VCO, but don't worry about a CV input or output just yet! We
need to calibrate the 1v rail by using the top right-hand trim pot. Grab a multimeter and use
the "volts" setting to measure across the
1v
&
GND
which are located just beneath the 10 pin
power header. Adjust the trim pot until you measure exactly 1v. This is regulated by a
precision voltage regulator and this is what feeds the Self-Tuning circuit.
Step 11: Now time to run up the VCO on your system so we can calibrate the 1v/oct setting.
You'll need to use an external tuner for this part – I just use the built in one on Ableton, but a
phone app, or hardware tuner should work just the same.
This step is the same on any 3340 VCO build – you need to make sure each 'C' note is exactly
one octave apart. Adjust VR5 (top left trim pot) until these are exactly in tune.
6