Austria Email EBH-KDW Manuale di istruzioni per il funzionamento e il montaggio - Pagina 6

Sfoglia online o scarica il pdf Manuale di istruzioni per il funzionamento e il montaggio per Riscaldatore Austria Email EBH-KDW. Austria Email EBH-KDW 14.
Anche per Austria Email EBH-KDW: Manuale di istruzioni per il funzionamento e il montaggio (14 pagine)

Austria Email EBH-KDW Manuale di istruzioni per il funzionamento e il montaggio

5.4 Water Connection of Tank

It is imperative that the mounting, connecting and operating instructions of the hot water tank (boiler) are complied with.
Pressure-proof connection:
Any warranty shall be rejected in the case that unsuitable or inoperative tank connector fittings are used as well as in the
event of any exceedance of the specified operating pressure.
The plumbing must be performed exclusively using a design certified diaphragm safety valve or a combined diaphragm
safety valve connector fitting for pressure-proof storage tanks!
A safety valve combination (see "Tank connection pursuant to DIN 1988") is installed in the cold water supply line (blue) of
the tank in the order as drawn.

5.5 Electrical Connection

The connection with the power grid must be implemented in conformity with the applicable national regulations and stan-
dards, the relevant connecting requirements of the local power company and waterworks, as well as the standards of the
Mounting and Operating Instructions, and must be performed exclusively by a licensed electrician. The stipulated protec-
tive measures must be executed carefully, so that no other power-supplied devices are affected thereby in the event of a
malfunction or failure of the hot water tank's power supply (e.g. freezer, rooms used for medical purposes, units for inten-
sive care, etc.).
In rooms with bathtubs or showers, the device must be installed in accordance with the national laws and regulations (e.g.
of ÖVE-SEV, VDE or DIN VDE 0100-701).
The technical connecting requirements (TAB) of the relevant energy supply company must absolutely be observed.
A residual current circuit breaker with a tripping current I
The device must only be connected with permanently laid lines.
These types of water heaters are to be supplied exclusively via a hard-wired connection cable and are therefore not sui-
table for connection via a shock-proof plug (SKI). Accidental activation of the upstream RCD is to be avoided in this way.
An all-pole disconnecting unit with at least 3mm contact clearance must be connected in series before the device. This
requirement is fulfilled e.g. by an automatic cutout.
It is imperative that the hot water tank is filled with water prior to electrical start-up.
In accordance with the safety regulations, the hot water tank must be switched powerless, secured against being swit-
ched on again and checked for powerlessness prior to any intervention. Interventions to the electrics of the device must
only be performed by a licensed electrician.
As a rule, the electrical connection must be performed in accordance with the circuit diagram affixed inside the connec-
ting area of the tank!
Id.Nr.: 228557-10
≤30mA must be connected in series before the electric circuit.
∆N
6
E
E