aFe Power TR-4306B-D Manuale di istruzioni - Pagina 10
Sfoglia online o scarica il pdf Manuale di istruzioni per Ricambi per auto aFe Power TR-4306B-D. aFe Power TR-4306B-D 16. Stage-2 air intake
![aFe Power TR-4306B-D Manuale di istruzioni](/uploads/products/server2/184772/184772.jpg)
INSTALL
Figure G
Refer to Figure G for Steps 15-17
Step 15: Insert the Takeda air scoop though the housing opening, assure it snaps in to the grooves.
Step 16: Re-install the OE push pins to secure the Takeda air Scoop.
Step 17: Make sure all bolt and clamps are tight, installation is now complete. Thank you for
choosing Takeda.
NOTE: Retighten all connections after approximately 100-200 miles.
Place enclosed CARB EO sticker on or near the device on a smooth, clean surface.
EO identification label is required to pass the smog inspection.
Page 10