Gage Bilt GB715 Manuale di installazione - Pagina 9
Sfoglia online o scarica il pdf Manuale di installazione per Utensile elettrico Gage Bilt GB715. Gage Bilt GB715 17.
Anche per Gage Bilt GB715: Manuale di istruzioni originale (20 pagine)
WARNING:
Tool must be maintained in a safe working condition at all times and examined on a daily basis for damage or
wear. Any repair should be done by qualified personnel trained on Gage Bilt procedures.
WARNING:
Excessive contact with hydraulic oil and lubricants should be avoided.
WARNING:
Maintenance personnel
WARNING:
Disconnect tool from its power source before performing maintenance, cleaning or when replacing worn or
damaged components. Severe personal injury may occur if power source is not disconnected.
WARNING:
Read SDS documents for all applicable materials.
The performance of any tool depends upon good maintenance practices. Following these minimal requirements daily will extend the
life of your tool.
*Check tool and nose assembly for damage. (Replace/Repair if necessary). See Overhaul for tool repair.
*Inspect all hoses and couplings for wear, damage and leaks. Replace/Repair if necessary. (See hydraulic thread preparation pg.9)
*Verify that hydraulic hose fittings and couplings, air and electrical connections are secure. Tighten, Replace or Repair if necessary
(See hydraulic thread preparation pg.9)
*Cycle the tool several times to assure there are no leaks during use.
* Do not use as a hammer to force fasteners into holes or otherwise abuse tool.
* Proper care by operators is necessary in maintaining full productivity and reducing downtime.
*Keep nose assemblies, especially jaws, clean and free of chips and debris. Lube jaws and collet surfaces that jaws ride on with
light machine oil on a daily basis.
*All Screwed End Caps, Base Covers, Air Fittings, Air Actuators, Screws and Nose Assemblies are to be examined at the end of
each working shift to check that they are secure.
* Keep the hydraulic system full and free of air by using the air bleeder (704153) on a weekly basis. (See Bleeding Procedure pg. 10).
Daily cleaning and lubrication of nose assembly will greatly reduce downtime and increase life of components. Using sewing
machine oil, or an equivalent cleaner/lubricant, follow instructions below.
CLEANING
Clean nose daily or as often as needed.
1. Dip into mineral spirits or similar solvent to
clean jaws and wash away metal chips and debris.
2. Disassemble nose and use a sharp "pick" to
removed embedded particles from grooves of jaws.
TORQUE SPECIFICATIONS
Button Head Cap Screws (A-928) = 40 inch lbs.
Packing Plug (704118) = 45 foot lbs.
Flexlock Nut (400559) = 40 inch lbs.
End Cap (715111) = 45 foot lbs.
Button Head Cap Screws (402482) = 35-40 inch lbs. (Do NOT over-tighten)
GB715 S/N: 1242 AND ABOVE
PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
DAILY MAINTENANCE
MUST
read and understand all warnings and cautions.
WEEKLY MAINTENANCE
SEE TROUBLESHOOTING AND OVERHAUL FOR FURTHER GUIDANCE.
CLEANING AND LUBRICATING PROCEDURE
LUBRICATING
Lubricate nose after each cleaning and as
often as needed
1. Disconnect tool vacuum line (if equipped).
2. Point nose assembly into oil as shown.
3. Cycle tool 8-10 times and wipe dry.
9
Image may
not reflect
actual tool
REV. 2/16