Great Lakes GL790EZ-2448S Manuale di istruzioni per l'installazione - Pagina 8

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Cremagliere e cavalletti Great Lakes GL790EZ-2448S. Great Lakes GL790EZ-2448S 17. Ez seismic cabinet

TOP PANEL MOUNTING

The top panel of the cabinet is
installed at the manufacturer.
Removing the top panel can
be done by removing the four
#10-32 x 1/2" lg screws.
Then simply lift the top
panel out or off.
There are 6 top panel options (The TPES-S Solid Top Panel is standard)
for the EZ cabinet:
TPES-S
TPES-P
Solid
Perforated
Standard
RAIL ADJUSTMENT
The EZ cabinet comes standard with 19" 310-E compliant, 3/8" SQ hole
mounting rails. These rails are fully adjustable front to back. To adjust
rails, loosen the ¼-20 hardware using a 3/8" socket and slide them
to the desired position. (There are "tabs" in the horizontal mounting
brackets – if adjustment is required past these tabs, loosen and
remove the hardware then reinstall)
1/4 - 20 Locking
Flange Nut
Top & Bottom Rail Mounting
8
TPES-F
Three,
75 CFM Fans
1/4 - 20 Hex
Head Bolt
1/4 - 20
Carriage Bolt
#10-32 x 1/2"
Pan Head
Screws
TPES-F10
TPES-2F10
One, 10" 550 Two, 10" 550
CFM Fan
1/4 - 20 Sliding
Nut Plate
Center Rail Mounting
TPES-B
Grommet
CFM Fans
Brush
B
A
A
B
A
B