Celec ES-65 Manuale di installazione - Pagina 7
Sfoglia online o scarica il pdf Manuale di installazione per Controllore Celec ES-65. Celec ES-65 10.
ES-65
Field Installation Manual
Connection Type#2
Use these instructions
If 125 Amp circuit breaker is unavailable, existing blanks are available.
ES-65 unit is designed for use with Customer Main Breaker Panel Three Phase
277/480V AC WYE/Delta Connection, up to 1000 Ampere.
ES-65 units should be mounted with four appropriate sized fasteners before connect to Main Breaker
Panel.
1. Switch off the external handle of load break switch (LBS), using panel key open the door of ES-65
exposing connections.
2. Remove existing 3 Pole breaker blanks and install new 3 Pole 125 Amp circuit Breakers.
3. For rest of connection follow the Connection type#1 on page 5.
________________________________________________________________________________________
7