GReddy Turbo Kit Emanage Ultimate Manuale di installazione - Pagina 12
Sfoglia online o scarica il pdf Manuale di installazione per Automobile Accessories GReddy Turbo Kit Emanage Ultimate. GReddy Turbo Kit Emanage Ultimate 18. 2003 mazda rx-8 (13b-msp) t618z 10cm2 (actuator type)
3-5 Intercooler Installation
1. Remove the auxiliary temp sensor on the
bumper reinforcement, and rotate it 180 , then
reinstall it back to the original mounting
location.
2. Install the intercooler mounting bracket to the
bumper reinforcement mounting bolt. Then
install the intercooler to the bracket.
*Adjust the bracket to mounting intercooler
parallel.
3. Remove the plastic part between the lower
radiator hose and bracket. Bend the bracket up
and secure it with zip ties as shown.
4. Install the compression pipe C-2 and C-3
between the C-1 to the intercooler with
provided hose and hose band.
Secure C-2 bracket to the speed sensor
harness bracket (RH).
(Parts Used #9, 10, 33, 36, 40, 41)
5. Install the compression pipe C-4, C-5, and C-6
between the intercooler and throttle using the
provided hoses and hose bands. Connect the
Jet Air Fuel Mixing sir hose to the fitting on the
back of C-6 pipe. This hose has a large
amount of suction when idling and is the top
hose that routes behind the alternator. It is
important to connect this hose properly to this
location.
(Parts Used #4, 5, 64)