activTek INDUCT 5000 Manuale - Pagina 4

Sfoglia online o scarica il pdf Manuale per Pulitore d'aria activTek INDUCT 5000. activTek INDUCT 5000 16. Electronic air purification system
Anche per activTek INDUCT 5000: Manuale (16 pagine)

INSTALLATION REQUIREMENTS

1.
Unit should be installed after the air handler in the HVAC system.
2.
The duct work around the installation area should be clean and dry to ensure proper adhesion of
the gasket materials and any tape used.
3.
Depending on model, one opening (activTek INDUCT 5000) or two openings
(activTek INDUCT 10000) approximately 4" (four inches) (10.16 cm) in diameter
will need to be cut into the existing duct work to install the unit properly.
CAUTION:
WARNING: If installed near a furnace or where emergency heat coils could raise the temperature
inside the plenum, cycle the AC unit through three full heating cycles assuring that the
temperature never exceeds 200º F (93º C). The ActivePure® cell must not exceed 200º F
(93º C).
ELECTRICAL REQUIREMENTS
CAUTION: Wiring of the unit into your HVAC system should be done by a licensed HVAC
WARNING: This unit is equipped with a universal ballast that operates at nominal voltages
For 120 volt unit: Black = L1, White = Neutral, Green = Ground
For 220 volt unit: Black = L1, White = L2, Green = Ground
International Units: Brown = L1, Blue = Neutral, Green with Yellow Stripe = Ground
Unit is shipped with a blunt cord. If required, installation of a UL approved plug should be done by a
qualified electrical contractor.
INSTALLATION CLEARANCES
activTek INDUCT 5000 - Min. 10" x 10"
activTek INDUCT 10000 - Min. 12" x 12"
4
When the unit is installed in a roof mounted HVAC system, the unit must be protected
from the elements.
installer or electrical contractor only.
between 100 and 277 VAC, 50/60 Hz.
Air Handler