HighPoint R1000 Series Manuale di installazione rapida - Pagina 5
Sfoglia online o scarica il pdf Manuale di installazione rapida per Hardware del computer HighPoint R1000 Series. HighPoint R1000 Series 9. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
Anche per HighPoint R1000 Series: Manuale di installazione rapida (8 pagine), Manuale di installazione rapida (10 pagine)
R1104/R1204 Hardware Installation:
Step 1. On the rear of the controller, remove the six screws that secure
the unit's heat sink to the PCB.
Step 2. After removing the screws, carefully remove the heat sink from
the controller card. Carefully turn the heatsink over to view the
thermal pad. The blue film must be removed from the pad before
reinstalling the panel. This film protects the pad from damage and
foreign objects prior to installation, but will also prevent the pad
from transferring heat away from the NVMe SSD's and controller
componentry.
5