Emerson CSB400 Series Scheda di installazione
Sfoglia online o scarica il pdf Scheda di installazione per Apparecchiature industriali Emerson CSB400 Series. Emerson CSB400 Series 8. Balance port and stem/ stem guide change-out procedure
Installation Sheet
October 2015
CSB400 Series Balance Port and Stem/
Stem Guide Change-Out Procedure
WarninG
!
Failure to follow these instructions or
to properly install and maintain this
equipment could result in an explosion
and/or fire causing property damage and
personal injury or death.
Fisher
regulators must be installed,
®
operated, and maintained in accordance
with federal, state, and local codes, rules
and regulations, and Emerson Process
Management regulator Technologies, inc.
(Emerson™) instructions.
if the regulator vents gas or a leak
develops in the system, service to the unit
may be required. Failure to correct trouble
could result in a hazardous condition.
Call a gas service person to service the
unit. Only a qualified person must install or
service the regulator.
introduction
Scope of the Manual
This Installation Sheet provides change-out procedure
for CSB400 Series Balance Port and Stem/Stem
Guide. Complete instructions for installation,
maintenance and parts ordering information for the
CSB400 Series regulators are found in a separate
Instruction Manual (D103123X012).
Table 1. CSB400 Series Balance Port, Stem and Stem Guide
rEGiSTraTiOn
Internal/Dual
Internal/Dual
Internal/Dual
Internal/Dual
* Complete key and part numbers of each spare part are found in CSB400 Series
Instruction Manual (D103123X012).
Change-out Procedure
To avoid personal injury or equipment
damage, do not attempt any maintenance
or disassembly without first isolating
the regulator from system pressure
and relieving all internal pressure as
described in "Shutdown" section.
regulators that have been disassembled
for repair must be tested for proper
operation before being returned to
service. Only parts manufactured by
regulator Technologies should be used
for repairing Fisher regulators. restart
gas utilization equipment according to
normal startup procedures.
www.fisherregulators.com
CSB400 Series
Retrofit Kits
DiSk
BODy
Standard
Standard
Temperature
Standard
1 X 2-1/4 inches
Temperature
GAZ
Low
Standard
Temperature
Low
1 X 2-1/4 inches
Temperature
GAZ
WarninG
!
kiT*
RCSB400BPK1
RCSB400BPK2
RCSB400BPK3
RCSB400BPK4