highwood Home & Garden Hazleton Mailbox Post Manuale di montaggio
Sfoglia online o scarica il pdf Manuale di montaggio per Sistema di mailing digitale highwood Home & Garden Hazleton Mailbox Post. highwood Home & Garden Hazleton Mailbox Post 2.
Home & Garden
Hazleton Mailbox Post
Assembly Guide
IMPORTANT!
DO NOT fully tighten the bolts until all bolts are started.
Once all bolts are inserted, go back & tighten all the bolts.
HARDWARE INCLUDED
A
FILL
21"
#7 x 3"
LEVEL
Ground level
18"
GRAVEL
For information on Care and Cleaning or to Register your
highwood product, please visit www.highwood-usa.com.
Qty: 6
CUSTOMER SUPPLIED TOOLS
Cordless screwdriver/drill OR
Multi-bit handle for the Torx Bit
IMPORTANT! Check for Underground
Services With Your Local Authorities
BEFORE Installation of This Product.
1) Dig a Hole Approximately 21" Deep. Fill The
Hole With Approximately 3" of Gravel At the
Bottom For Water Drainage.
2) Insert the Base of the Post Into the Hole and
Fill the Hole With Concrete or Packed Stone
Dust. Using a Hand level, Ensure the Post is
Plumb on All Sides
TOOLS INCLUDED
T-15 TORX BIT
MLBX1
08.03.2021
PAGE 1 OF 2