AGS Merlin 1000S Manuale di installazione e funzionamento - Pagina 3
Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Controllore AGS Merlin 1000S. AGS Merlin 1000S 16. Gas utility isolation controller
Anche per AGS Merlin 1000S: Manuale d'uso e installazione (10 pagine), Manuale di installazione, funzionamento e manutenzione (10 pagine), Manuale di installazione e funzionamento (12 pagine)
Installation & Operation Manual
INSTALLATION
Planning
The Merlin 1000S gas pressure proving and detection system is designed specifically for use in
educational establishments and laboratories.
This panel is to be used to carry out a gas proving test on the pipe work in order to highlight if
there is a gas appliance open or a gas leak in a laboratory or similar environment.
The Merlin 1000S is designed to give the teacher full control over the incoming gas supply with
the lockable main key-switch and touch sensors.
The Merlin 1000S can work in conjunction with carbon dioxide, natural gas, carbon monoxide
and LPG sensors. The Merlin 1000S also has a built in "timeout" facility which will automatically
shut off the gas solenoid valve at the end of a specific time period, this time period can be
adjusted to 2, 5, 8 hours or can be overridden if required.
Please refer to your detector manual for important information regarding coverage,
location and positioning including areas and conditions to avoid.
Placing the panel at eye level allows for optimum monitoring of LED Indicators.
Fixing - Mounting
Unpack all the parts!
1. Carefully remove the front cover from the unit by unscrewing the four bolts located at each
corner. To do this – use the socket wrench provided.
2. Mark the four screw holes located on the back of the enclosure to the wall. Ensure the wall
surface is flat to prevent base distortion.
3. After executing the mounting and the connections – replace the front cover and insert the
security caps over the four bolts.
Be careful when creating access for cables – Damage to boards will void any warranty.
Carefully remove the circuit board before drilling cable entry holes.
A flush mount kit is available, comprising of a mounting bracket and decorative surround strip.
Contact your supplier for more information.
1000S IOM Rev: 07
01-20
Merlin 1000S
3