Galvin Engineering 201.10.70.10 Istruzioni per l'installazione - Pagina 7
Sfoglia online o scarica il pdf Istruzioni per l'installazione per Unità di controllo Galvin Engineering 201.10.70.10. Galvin Engineering 201.10.70.10 13. Lead safe thermostatic mixing valve cabinet
Product Installation Guidelines & Scope of Use
3. Connect water lines
Before connecting to water lines, all lines must
be flushed
Remove protective vinyl cap from copper
tubes.
Join each copper tube to the correct main
water line, taking note of flow direction
arrows. Use suitable copper joining methods,
ensuring no flash sits inside the pipeline, this
will cause damage to the valves.
Note: The Galvin Engineering CliniMix
Thermostatic Mixing Valve must be
installed by a licensed plumber. If the
valve is not installed correctly then it
will not function correctly and may
put the user in danger. It may also
void the warranty of the valve.
For commissioning, maintenance, temperature adjustment, spare parts and on-going servicing information refer to
© Galvin Engineering Pty Ltd
4. Testing and operation
201.70.11.09 Install from www.galvinengineering.com.au.
Adjust the door door frame until it sits flush with the wall.
Completely tighten mounting fasteners and apply sealant if
necessary.
Turn on hot and cold water supply.
Check for any leaks
Carry out commissioning procedure as per 201.70.11.09
installation instructions.
Check temperature of water is correct. If not, see
temperature adjustment in 201.70.11.09 installation
instructions available from www.galvinengineering.com.au.
Fit hinged door back into cabinet and lock with supplied key.
Ensure instructions are placed in the cabinet for future
service and maintenance record.
Version 1, 13 November 2023, Page 7 of 13
Apply sealant