Galvin Specialised 42030 Installazione del prodotto Manualline - Pagina 2

Sfoglia online o scarica il pdf Installazione del prodotto Manualline per Prodotto idraulico Galvin Specialised 42030. Galvin Specialised 42030 6.

Galvin Specialised 42030 Installazione del prodotto Manualline
Product Installation Guideline
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and in accordance with the
national and local regulatory water requirements. Water and/or electrical supply conditions must also comply to the applicable National
standards. Failing to comply with these provisions shall void the product warranty and may affect the performance of the product.
1. Fit face plate assembly
Fit the face plate assembly into the panel.
Secure face plate with supplied M6 nuts
and spring washers.

TROUBLESHOOTING

PROBLEM
Face plate does not sit flush on panel
surface.
The desired mixed water temperature
cannot be obtained.
The valve will not shut off.
SERVICE AND MAINTENANCE
1. Disconnect water line
Turn of the water supply and turn on the
tap handle to release any pressure in the
lines.
Disconnect cold,hot & outlet water
connections.
2. Connect water supply
Connect water supply to correct inlet as
shown, use a suitable thread sealing
compound making sure there are no
obstructions or blockages to the pipework.
Note: Water supply should be flushed
before fitting. The use of in-line strainers is
highly recommended.
CAUSE
Mounting holes not drilled correct size or PCD is
incorrect or the panel is not flat.
Hot and cold water supply are fitted to the wrong
connections.
Waterway contains debris preventing correct
operation.
Cartridge contains debris.
2. Remove face plate assembly
Unscrew face plate M6 screws from studs
at rear panel.
Pull out face plate body assembly from the
panel.
Version 16 February 2017 Page 2 of 3
3. Testing
Once fitted and test body unit for leaks
and correct operation.
RECTIFICATION
Re-drill as per rough in details
Replace or straighten panel.
Re-fit the valve with hot and cold water
supply to the correct connections.
Water supply issue – contact facility
management.
Clean or replace cartridge.
3. Remove grub screw
Unscrew grub screw from the body
assembly.