Galvin Specialised Ezy-Drink TD90P/2 Installazione del prodotto Manualline - Pagina 2
Sfoglia online o scarica il pdf Installazione del prodotto Manualline per Prodotto idraulico Galvin Specialised Ezy-Drink TD90P/2. Galvin Specialised Ezy-Drink TD90P/2 4. Push button bubbler tapware
PRE-INSTALLATION - MOUNTING DETAILS
−
TD90C - If the mounting holes do not already exist, mark out
and drill the holes in the wall/sheet, as shown in rough-in dimensions.
Note: Before installation, all lines must be flushed. We recommend that a line
strainer be installed prior to drinking taps to eliminate any foreign material
120
70°
ASSEMBLY
1/2" BSP
(SIDE VIEW AS
INSTALLED)
TD45P
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Fit tap assembly
− The drinking taps are fitted with flow
restrictors.
−
When applying thread tape or sealant to the
inlet, ensure the opening is not obscured.
Failure to do so may restrict or block the flow
restrictor, affecting the flow of water.
120
1/2" BSP
ASSEMBLY
ASSEMBLY
(SIDE VIEW AS INSTALLED)
(SIDE VIEW AS INSTALLED)
TD90P-2
2. Secure the body
Version 2, 8 June 2017, Page 2 of 4
.
135 NOM
1/2" BSP
− Secure the body with supplied screws.
−
Ensure outlet is 15° angled.
50.5
TO SUIT
SCREWS
USED
15°
ASSEMBLY
(AS SEEN BY USER)
TD90P